7. PRODUCT REALIZATION 7.1 Planning of Product Realization MII plans and
develops the processes needed for product realization. Planning of product
realization is consistent with the requirements of the other processes of the
quality management system (see 4.1). In planning
product realization, MII determines the following, as appropriate: a. quality objectives and requirements
for the product; (See Procedures P4.10 Inspecting and Testing) b. the need to establish
processes, documents, and provide resources specific to the product; (See
Procedures P4.3 Contract Review and P4.9 Process Control) c. required verification,
validation, monitoring, inspection and test activities specific to the product
and the criteria for product acceptance; (See Procedures P4.3 Contract Review,
P4.6 Purchasing, P4.9 Process Control, and P4.10 Inspection and Testing) d. records needed to provide
evidence that the realization processes and resulting product meet requirements
(see Quality Records Procedure P4.16); e. the identification of resources to
support operation and maintenance of the product. (See Process Control P4.9) The output of this
planning is in a form suitable for MII' method of operations. The production documents needed are
documented in the Processes - Contract Review P4.3, Purchasing P4.6, Process
and Control P4.9, and Inspection and Testing P4.10. 7.2 Customer-Related Processes 7.2.1 Determination of
Requirements Related to the Product MII determines: a.
requirements specified by the customer, including the requirements for
delivery and post-delivery activities, (Procedure P4.3, Contract Review). b.
requirements not stated by the customer but necessary for specified or
intended use, where known, - Mallory utilizes Contract Review forms, Engineering Change Notices,
and Work Order Travelers to document these additional requirements. c. statutory and
regulatory requirements related to the product, and d. any additional
requirements determined by MII. See Procedure P4.3, Contract Review. 7.2.2 Review of Requirements Related to the
Product MII shall review the requirements related to the product. This review
shall be conducted according to Procedure P4.3 Contract Review. MII’ commitment to supply a product to the
customer (e.g. submission of tenders, acceptance of contracts or orders,
acceptance of changes to contracts or orders) and shall ensure that: a.
product requirements are defined, b.
contract or order requirements differing from those previously expressed
are resolved, c.
MII has the ability to meet the defined requirements,
and d.
risks (e.g., new technology,
short delivery time scale) have been evaluated. (see Procedure P4.3, Contract Review). Records of the results of the review and actions arising from the review are maintained (see P4.3, Contract Review Procedure). Where the
customer provides no documented statement of requirement, the customer
requirements are confirmed by MII before acceptance. Where product
requirements are changed, MII ensures that relevant documents are amended and
that relevant personnel are made aware of the changed requirements. 7.2.3 Customer Communication MII shall
determine and implement effective arrangements for communicating with customers
in relation to: a. product information,
(web, catalogues, sales visits) b. enquiries, contracts or
order handling, including amendments, and (phone system, web, email, sales
contact) c. customer feedback,
including customer complaints (phone, mail, email, surveys, customer supplier
ratings, etc) . 7.3
Design and Development Currently MII does not perform Design and
Development operations and is exempt from this requirement. |
|